IIT (BHU) students pull off historic silicon tape-out, deliver fabrication-ready chip in just five months

Jun 12, 2026 - 17:00
 0  1
IIT (BHU) students pull off historic silicon tape-out, deliver fabrication-ready chip in just five months
IIT (BHU) students have achieved a major breakthrough by completing the institute’s first-ever silicon tape-out, taking a semiconductor chip from design to fabrication submission in just five months. Led largely by second-year Electronics Engineering students, the team developed a 64-point FFT Hardware Accelerator, demonstrating advanced chip-design capabilities and contributing to India’s growing semiconductor ecosystem. The achievement highlights the potential of undergraduate research and sets a new benchmark for student-led innovation in semiconductor technology.

What's Your Reaction?

Like Like 0
Dislike Dislike 0
Love Love 0
Funny Funny 0
Angry Angry 0
Sad Sad 0
Wow Wow 0